MES Academy Building
About the Project
Electrical power supply and distribution systems were installed and upgraded at the MES Academy building.
The project included electrical equipment, power transformers, protection automation, cable installation, system testing and commissioning.
Client
MES
Location
Baku
Sector
Government & Public
Services
Electrical Engineering
Scope
Installation & commissioning
Status
Completed
Year
—
Systems Delivered
Systems delivered
Electrical
HVAC / Ventilation
Water Supply
Energy Supply
Commissioning
Result
An integrated system ready for operation.
All engineering systems are installed, tested and commissioned in a coordinated manner. The facility is delivered as a complete solution by a single technical partner.