Electrical supply infrastructure and substation equipment were installed for the MES Sports & Health Complex.
The scope included equipment installation, system connections, technical testing and commissioning to ensure reliable power distribution across the facility.
Client
MES
Location
Hovsan, Baku
Sector
Government & Public
Services
Electrical · Substation
Scope
Installation & commissioning
Status
Completed
Year
2026
Systems Delivered
Systems delivered
Electrical
HVAC / Ventilation
Water Supply
Energy Supply
Commissioning
Result
An integrated system ready for operation.
All engineering systems are installed, tested and commissioned in a coordinated manner. The facility is delivered as a complete solution by a single technical partner.